Broadway station (LIRR)

Broadway
An M7 train departing Broadway, looking east.
General information
Location162nd Street and Northern Boulevard
Murray Hill, Queens, New York
Coordinates40°45′42″N 73°48′05″W / 40.761626°N 73.801383°W / 40.761626; -73.801383
Owned byLong Island Rail Road
Operated byMetropolitan Transportation Authority (MTA)
Line(s)Port Washington Branch
Distance9.2 mi (14.8 km) from Long Island City[1]
Platforms2 side platforms
Tracks2
ConnectionsLocal Transit NYCT Bus: Q12, Q13, Q28[2][3]
Local Transit MTA Bus: QM3
Local Transit Nassau Inter-County Express: n20G, n20x
Construction
Platform levels3
ParkingYes (parking meter)
AccessibleYes
Other information
Station codeBDY
Fare zone3
History
OpenedOctober 27, 1866 (NY&F)[4]
Rebuilt1906, 1913, 2003, 2007
ElectrifiedOctober 21, 1913
750 V (DC) third rail
Previous namesEast Flushing (1866–1872)
Passengers
2012—20142,400[5]
Rank46 of 125
Services
Ticket Machines, Waiting Room, Restrooms
Preceding station Long Island Rail Road Following station
Murray Hill Port Washington Branch Auburndale
Location
Map

Broadway is a station on the Long Island Rail Road's Port Washington Branch in the East Flushing and Broadway neighborhoods of Queens, New York City. The station is east of a rail overpass at the intersection of 162nd Street and Northern Boulevard. This station contains ramps that comply with the Americans with Disabilities Act (ADA), making it fully accessible.

  1. ^ Long Island Rail Road (May 14, 2012). "TIMETABLE No. 4" (PDF). p. VI. Retrieved August 6, 2022.
  2. ^ Long Island Rail Road. "Port Washington Branch Timetable" (PDF).
  3. ^ Long Island Rail Road. "Parking, Bus and Taxi Information: Broadway Station" (PDF).
  4. ^ Vincent F. Seyfried, The Long Island Rail Road: A Comprehensive History, Part Two: The Flushing, North Shore & Central Railroad, 1963
  5. ^ "2012-2014 LIRR Origin and Destination Report : Volume I: Travel Behavior Among All LIRR Passengers" (PDF). Metropolitan Transportation Authority. August 23, 2016. pp. 4–15(Sheet 15), WEEKDAY 2 of 3(Sheet 198. Archived (PDF) from the original on July 17, 2019. Retrieved March 29, 2020. Data collection took place after the pretest determinations, starting in September 2012 and concluding in May 2014. .... 2012-2014 LIRR O[rigin and ]D[estination] COUNTS: WEEKDAY East/West Total By Station in Numerical Order ... Broadway

© MMXXIII Rich X Search. We shall prevail. All rights reserved. Rich X Search