EA202 series

EA202 series KfW i9000
EA202 series EMU is leaving Palur Station and will be delivered to Stabling Solo Balapan
In service2013–present
ManufacturerIndustri Kereta Api
Bombardier Transportation
ReplacedEA201 series
Constructed2011
Entered service2013
Refurbished2019–2020[1]
Number built10 sets (40 cars)
SuccessorEA203 series
Formation4 carriages per set
Fleet numbersK3 1 11 01-K3 1 11 40
Capacity628 passengers (average)
OperatorsPT Kereta Commuter Indonesia
Lines servedFormer:
Specifications
Car body constructionStainless steel
Car length20 m (65 ft 7 in)[2]
Width2.99 m (9 ft 10 in)
Height3.82 m (12 ft 6 in)
Floor height1,100 mm (3 ft 7 in)
Doors3 pairs per side
Wheel diameter860 mm (new)
780 mm (worn)[3]
WheelbaseBetween axles: 2.2 mm (0.087 in)
Between bogie centers: 14 m (45 ft 11 in)
Maximum speed100 km/h (62 mph)
Traction systemBombardier MITRAC IEC 349-2 IGBTVVVF
Traction motorsMJA.280-3 asynchronous 3-phase AC
Acceleration2.88 km/(h⋅s) (1.79 mph/s)
Deceleration3.3 km/(h⋅s) (2.1 mph/s) (normal)
4.3 km/(h⋅s) (2.7 mph/s) (emergency)
AuxiliariesStatic Inverter (SIV)
Power supplyOHLE
HVACKonvekta (before refurbishment)
INKA I-Cond (after refurbishment)
Electric system(s)1.500 V DC overhead
Current collector(s)Pantograph
BogiesBolsterless Bogie
Motor: MB-409
Trailer: TB-809
Braking system(s)Electropneumatic Regenerative Brake
Safety system(s)TMS and Deadman Control
Coupling systemAAR/Janney coupler Type H
SeatingLongitudinal
Track gauge1,067 mm (3 ft 6 in)

EA202 series, colloquially known as KfW i9000 after its financial backer the KfW, is an electric multiple unit train type produced by Industri Kereta Api (INKA) which operates across the KAI Commuter Yogyakarta Line and formerly in Greater Jakarta. EA202 series was purchased by Ministry of Transportation for 40 units (10 sets).[4]

INKA collaborated with Bombardier Transportation to build EA202 series and it was completed in 2011. A total of 40 units (10 series) of 4 cars began to be brought in from the INKA factory in Madiun to Jakarta and went through a series of trials to see the performance and reliability.

In early 2013, EA202 series, which is similar in shape to EA201 series, underwent a trial operation before it is currently operating.

  1. ^ "KUNJUNGAN KERJA DIREKTUR SARANA PERKERETAAPIAN DALAM RANGKA MONITORING KEGIATAN REVITALISASI KRL KFW DAN PEMBANGUNAN BALAI PERAWATAN PERKERETAAPIAN" (in Indonesian). Ministry of Transportation. 31 May 2019.
  2. ^ "Railways Products | PT Industri Kereta Api (Persero)". Archived from the original on 6 June 2017.
  3. ^ "EMU | PT INKA". Archived from the original on 8 February 2012.
  4. ^ KA Magazine June 2014 Edition

© MMXXIII Rich X Search. We shall prevail. All rights reserved. Rich X Search