Green Line (Delhi Metro)

Green Line
(Line 5)
A new train being launched in the opening of the Kirti Nagar branch in 2011.
Overview
StatusPartly Operational
OwnerDMRC
LocaleDelhi, Bahadurgarh
Termini
Stations24
Service
TypeRapid transit
SystemDelhi Metro
Operator(s)Delhi Metro Rail Corporation
Rolling stockMitsubishi-ROTEM-BEML
History
Opened
Technical
Line length28.79 km (17.89 mi)
CharacterElevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC overhead catenary
Highest elevation215 m
Route map

Kirti Nagar
Satguru Ram Singh Marg
Patel Nagar railway station
Inderlok
Ashok Park Main
Punjabi Bagh
Ring Road
Punjabi Bagh West
Shivaji Park
Madipur
Paschim Vihar East
Paschim Vihar West
Outer Ring Road
Peeragarhi
Udyog Nagar
Maharaja Surajmal Stadium
Najafgarh Road
Nangloi
Nangloi Railway Station
Nangloi railway station
Rajdhani Park
Mundka
Mundka Industrial Area (MIA)
Ghevra
Tikri Kalan
Tikri Border
Delhi
Haryana
border
Pandit Shree Ram Sharma
Bahadurgarh City
Brigadier Hoshiyar Singh

Inderlok
Daya Basti
Sarai Rohilla
Delhi Sarai Rohilla railway station
Ajmal Khan Park
Nabi Karim
New Delhi
Turkman Gate
Delhi Gate
Mahatma Gandhi Marg
Delhi Sachivalaya
Indraprastha
[1]

The Green Line (Line 5) is a metro rail line of the Delhi Metro, a rapid transit system in Delhi, India. The line consists of 24 stations covering a total length of 28.79  km. It runs between Inderlok and Brigadier Hoshiyar Singh with a branch line connecting the line's Ashok Park Main station with Kirti Nagar station.[2]

It is almost an elevated line except for Kirti Nagar Metro Station which is At Grade and runs mostly along the busy NH 9 route in North Delhi and North West Delhi, bypassing Tikri Border to enter Bahadurgarh. It is the first Delhi metro line on standard gauge, as opposed to 5 ft 6 in (1,676 mm) broad gauge, prevalent in Red, Yellow and Blue Lines.

A 12.37 km extension of Green Line with ten stations was approved by the Union Government in March 2024. Construction is expected to begin in 2024, as part of the fourth phase of the Delhi Metro's development, and is slated to be completed by 2029.[3][4][5]

  1. ^ "Delhi Metro Phase 4 – Information, Route Maps, Tenders & Updates". The Metro Rail Guy. Retrieved 13 February 2024.
  2. ^ "PM Narendra Modi inaugurates Mundka-Bahardurgarh metro network".
  3. ^ "Delhi to get two new Metro lines: Lajpat Nagar-Saket, Inderlok-Indraprastha". The Indian Express. 13 March 2024. Retrieved 5 April 2024.
  4. ^ "Delhi Metro Phase-IV: Union Cabinet approves two corridors of Delhi Metro Projects". The Hindu. 13 March 2024. ISSN 0971-751X. Retrieved 5 April 2024.
  5. ^ "Union Cabinet approves two new Metro lines in Delhi; check routes, stations". Business Today. 13 March 2024. Retrieved 5 April 2024.

© MMXXIII Rich X Search. We shall prevail. All rights reserved. Rich X Search