Sydney Trains

Sydney Trains
B set trains at Summer Hill station
B set trains at Summer Hill station
Roundel
Roundel
Overview
OwnerTransport for NSW
LocaleGreater Sydney
Transit typeSuburban rail
Number of lines8
Number of stations170
Annual ridership288.3 million (FY 2022–2023)
Chief executiveMatt Longland
WebsiteTransport for NSW: Sydney Trains
Operation
Began operation1 July 2013 (2013-07-01)
Technical
System length369 km (229 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification1,500 V DC from overhead catenary
System map

Sydney Trains is the operator and brand name of the principal train network serving the Greater Sydney metropolitan area in New South Wales, Australia. The network is a hybrid urban-suburban rail system with a central underground core that covers 369 km (229 mi) of route length over 813 km (505 mi) of track, with 170 stations on eight lines.[1]

Centred around an underground core, the network has frequencies of 5–10 minutes off-peak at most inner-city and major stations and 15 minutes off-peak at most minor stations. During the weekday peak, train services are more frequent.[2]

The network is managed by Transport for NSW and is part of its Opal ticketing system. In 2018–19, 377.1 million passenger journeys were made on the network, making it the most-used rail network in Australia.

  1. ^ Transport for NSW, Bureau of Transport Statistics (2014). "Train statistics 2014" (PDF). Archived (PDF) from the original on 28 February 2020. Retrieved 9 January 2023.
  2. ^ "Routes and timetables". Transport for NSW. Retrieved 3 July 2024.

© MMXXIII Rich X Search. We shall prevail. All rights reserved. Rich X Search