Thameslink, Southern and Great Northern franchise

Thameslink, Southern and Great Northern
Thameslink Class 700 at Blackfriars, in February 2016.
Current operatorGovia Thameslink Railway
Main Route(s)Thameslink, Great Northern, Southern and Gatwick Express
Dates of operation14 September 2014 – 1 April 2028[1]
Technical
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC OHLE
750 V DC third rail
Route map
Route map

Thameslink, Southern and Great Northern (TSGN) is a management contract for the provision of passenger services on the Thameslink and Great Northern routes to Bedford, Luton, Peterborough, King's Lynn, Cambridge, London King's Cross, London Moorgate, Sutton, Wimbledon and Brighton, as well as the whole Southern network (including the Gatwick Express) and the jointly operated First Capital Connect Southeastern services (for example the Kentish Town – Sevenoaks via Catford), which were added to the franchise on 25 July 2015, with the Southern and Gatwick Express brands retained.

The TSGN franchise is operated by Govia Thameslink Railway, owned by Govia,[2] and is the largest railway franchise in the United Kingdom.[3]

  1. ^ Cite error: The named reference dft22 was invoked but never defined (see the help page).
  2. ^ New rail franchising deal set to transform passenger services across London & south east Department for Transport 23 May 2014
  3. ^ Smith, Stefan. "What's the Key for the UK's Biggest Railway Franchise?". Retrieved 15 April 2019.

© MMXXIII Rich X Search. We shall prevail. All rights reserved. Rich X Search