Blue Line (Ahmedabad Metro)

Blue Line
Overview
StatusOperational
LocaleAhmedabad
Termini
Stations18
16 (operational)
Service
TypeRapid Transit
SystemAhmedabad Metro
Operator(s)Gujarat Metro Rail Corporation Limited
Rolling stockHyundai Rotem
History
Opened4 March 2019
Technical
Line length21.23 km (13.19 mi)[1]
CharacterElevated and underground
Track gauge1,435 mm (4 ft 8+12 in) (Standard gauge)
Electrification750V DC Third Rail
Route map

Thaltej Gam
Thaltej
Doordarshan Kendra
Gurukul Road
Gujarat University Ahmedabad Bus Rapid Transit System
Commerce Six Road
SP Stadium
Old High Court Subway interchange Red Line
Shahpur
Gheekanta
Kalupur Railway Station Ahmedabad Bus Rapid Transit System Ahmedabad Junction railway station
Kankaria East Ahmedabad Bus Rapid Transit System
Apparel Park Depot
Apparel Park
Amraiwadi
Rabari Colony Ahmedabad Bus Rapid Transit System
Vastral
Nirant Cross Road
Vastral Gam

The Blue Line of the Ahmedabad Metro is the first metro line of the Ahmedabad city's mass rapid transit rail. It consists of 18 metro stations (including two under construction), starting from Vastral Gam and ending at Thaltej Gam, with a total distance of 21.23 km (13.19 mi), with most of the it being elevated.

  1. ^ "PM Modi inaugurates Ahmedabad Metro first phase, takes a ride". Economic Times. 4 March 2019.

© MMXXIII Rich X Search. We shall prevail. All rights reserved. Rich X Search