Great Western Main Line

Great Western Main Line
Maidenhead Railway Bridge carrying the line over the River Thames.
Overview
StatusOperational
OwnerNetwork Rail
Locale
Termini
Stations25
Service
TypeCommuter rail, Higher-speed rail[1]
SystemNational Rail
Operator(s)
Depot(s)
Rolling stock
History
Opened30 June 1841 (complete line)
Technical
Line length118 miles 19 chains (190.28 km)
Number of tracksFour (London to Didcot),
two (Didcot to Bristol)
Track gauge4 ft 8+12 in (1,435 mm)
Old gauge7 ft 14 in (2,140 mm)
Electrification25 kV 50 hz AC OLE (London to Chippenham)
Operating speed125 mph (200 km/h)
SignallingAWS, TPWS, ATP
Route map
Great Western Main Line
miles
0
London Paddington TfL Rail Circle line (London Underground) District Line Hammersmith & City Line Bakerloo Line enlarge…
Paddington Goods
Royal Oak (Circle line (London Underground) Hammersmith & City Line)
Mileage Yard Goods & Coal
Subway Junction
Westbourne Park (Circle line (London Underground) Hammersmith & City Line)
Portobello Junction
Notting Hill Sidings
Kensal Green Gasworks siding
West London Junction
Old Oak Common Goods
Old Oak West Junction
Willesden & Acton Brick Co. siding
Acton Main Line
Ealing Broadway Central line (London Underground) District Line TfL Rail enlarge…
West Ealing TfL Rail
Hanwell
9
Southall
11
Hayes & Harlington TfL Rail
Airport Junction
to Heathrow Airport stations
14
West Drayton
Staines and West Drayton Railway
to Colnbrook Cargo Centre
14¾
Iver
16¼
Langley
18½
Slough TfL Rail
21
Burnham
22½
Taplow
24¼
Maidenhead TfL Rail
31
Twyford TfL Rail
Sonning Cutting
1 mile (1.6 km) long
60 feet (18 m) deep
Reading East Junction
36
Reading TfL Rail enlarge…
38¾
Tilehurst
41½
Pangbourne
44¾
Goring & Streatley
Moulsford
48½
Cholsey
Cholsey & Wallingford Railway
(bank holidays and weekends only)
Heritage railway
53
Didcot Parkway enlarge…
Didcot Railway Centre Didcot Railway Centre
Steventon
Wantage Road
Challow
Uffington
77¼
Swindon
Dauntsey
Christian Malford Halt
94
Chippenham
Thingley Junction
Corsham
Box Tunnel
2939 yd
2687 m
Box (Mill Lane) Halt
Box
Bathford Halt
Bathford Bridge
over River Avon
Bathampton Junction
Bathampton
Hampton Row Halt
107
Bath Spa
108
Oldfield Park
Twerton-on-Avon
Twerton Tunnel
Saltford Tunnel
Saltford
113¾
Keynsham
St Anne's Park No 3 Tunnel
1017 yd
930 m
St Anne's Park No 2 Tunnel
154 yd
141 m
St Anne's Park
North Somerset Junction
116½
Bristol Temple Meads
Bristol West Junction
Temple Meads Goods

The Great Western Main Line (GWML) is a main line railway in England that runs westwards from London Paddington to Bristol Temple Meads. It connects to other main lines such as those from Reading to Penzance and Swindon to Swansea.[2] The GWML is presently a part of the national rail system managed by Network Rail while the majority of passenger services upon it are provided by the current Great Western Railway franchise.

The GWML was built by the original Great Western Railway company between 1838 and 1841, as a dual track line in the 7 ft (2,134 mm) broad gauge. The broad gauge remained in use until 1892, after which standard gauge track has been exclusively used. Between 1877 and 1932, many sections of the GWML were widened to four tracks. During 1908, Automatic Train Control (ATC) was introduced as a safety measure. In 1948, the Great Western Railway, and thus the GWML, was merged into the Western Region of British Railways.

During the 1970s, the GWML was upgraded to support higher line speeds, as a result of which many sections permitted 125 mph (201 km/h) operations, enabling the newly-introduced InterCity 125 high speed train (HST) to make faster journeys. British Rail proposed widespread electrification of the line in the late 1970s, although this was not speedily implemented. During the mid 1990s, a stretch of the GWML between London Paddington and Hayes & Harlington was electrified using 25 kV AC overhead lines for the Heathrow Express. Further, although not total, electrification was carried out during the 2010s; this permitted the replacement of diesel-powered trains such as the InterCity 125 and Class 180 with electric and bi-mode train sets such as the Hitachi Super Express high speed trains, specifically the Class 800s and Class 802s. Due to budget overruns, the British government deferred electrification of the section through Bath from Royal Wootton Bassett to Bristol in 2016.

Communities served by the GWML include West London (including Acton, Ealing, Hanwell, Southall, Hayes, Harlington and West Drayton); Iver; Langley; Slough; Burnham; Taplow; Maidenhead; Twyford; Reading; Tilehurst; Pangbourne; Goring-on-Thames; Streatley; Cholsey; Didcot; Swindon; Chippenham; Bath; Keynsham; and Bristol. The route includes dozens of listed buildings and structures, including tunnel portals, bridges and viaducts, stations, and associated hotels. Presently, the GWML is electrified between London Paddington and Royal Wootton Bassett. In the long term, Network Rail plans to install European Rail Traffic Management System (ERTMS) in-cab signalling across the entire line.

  1. ^ Bowen, Douglas John (1 December 2014). "Hitachi Rail Europe taps Huber+Suhner". Railway Age. Archived from the original on 4 March 2016. Retrieved 2 December 2014.
  2. ^ "Western Route specification" (PDF). Archived (PDF) from the original on 16 July 2021. Retrieved 13 March 2020.

© MMXXIII Rich X Search. We shall prevail. All rights reserved. Rich X Search