Kolkata Metro Line 5

Kolkata Metro Line 5

Baranagar-Barrackpore Metro
Overview
StatusPlanned but Construction not started
OwnerMetro Railway, Kolkata
LocaleIndia Greater Kolkata
Termini
Connecting linesBlue Line
Stations11
Websitehttps://mtp.indianrailways.gov.in
Service
TypeRapid transit
SystemKolkata Metro
Operator(s)Metro Railway, Kolkata
Depot(s)Noapara Depot
Technical
Line length12.50 kilometres (7.77 mi)[1]
Number of tracks2
CharacterElevated
Track gauge5 ft 6 in (1,676 mm) broad gauge
Electrification750 V DC[2] using third rail
Operating speed80 km/h (designed)

The Baranagar to Barrackpore, 12.50 km (7.77 mi) metro corridor (Line 5)[1] in North 24 Parganas, is another line of Kolkata Metro, in Indian state of West Bengal. It was sanctioned in 2009, at a cost of Rs.2070 crore,[3] to enable a quicker commute from the northern suburbs to Kolkata, via North Kolkata.

  1. ^ a b "New System Map of Kolkata Metro".
  2. ^ CAF to supply Kolkata metro trains, Railway Gazette, 9 September 2012
  3. ^ Bandyopadhyay, Krishnendu (16 May 2018). "Metro: Metro iffy about state's Barrackpore route plan | Kolkata News - Times of India". The Times of India. Retrieved 28 February 2020.

© MMXXIII Rich X Search. We shall prevail. All rights reserved. Rich X Search