Metro North West Line

Metro North West Line
A Metropolis Stock train departing Kellyville
Overview
Service typeRapid transit
LocaleSydney, Australia
First service26 May 2019 (Chatswood to Tallawong)
2024 (Sydenham to Tallawong)
2025 (Bankstown to Tallawong)
Current operator(s)Metro Trains Sydney
Route
TerminiTallawong
Chatswood
Stops13
Distance travelled36 km (22 mi)
Average journey time37 minutes[1]
Service frequency4 minutes (peak)
10 minutes (off-peak)[1]
Technical
Rolling stockMetropolis Stock fully automated trains, 6 carriages per train
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification1,500 V DC from overhead catenary
Operating speedLimit of 100 km/h (62 mph)
Track owner(s)Transport Asset Holding Entity

The Metro North West Line is a rapid transit rail line in Sydney, New South Wales, Australia. The first and currently the only line on the Sydney Metro network, it commenced operation on 26 May 2019, running between Tallawong and Chatswood.

  1. ^ a b "M: Metro North West line timetable". Transport for NSW.

© MMXXIII Rich X Search. We shall prevail. All rights reserved. Rich X Search