Union Pacific Northwest Line

Union Pacific Northwest Line
A Union Pacific Northwest Line train led by an EMD F40PH in the Norwood Park neighborhood of Chicago, Illinois
Overview
Service typeCommuter Rail
LocaleCook and McHenry counties, Illinois
Current operator(s)
Ridership38,600 (Avg. Weekday 2014)[1]
18,800 (Avg. Weekend 2014)[2]
Annual ridership4,618,099 (2023)
Route
TerminiOgilvie Transportation Center
Harvard, McHenry
Stops22 (to Harvard)
20 (to McHenry)
23 (total)
Line(s) used
Technical
Track owner(s)Union Pacific Railroad
Route map
Map Union Pacific Northwest Line highlighted in yellow
63.2 mi
101.7 km
Former service
to Williams Bay
1
76.4 mi
123 km
70.4 mi
113.3 km
64.9 mi
104.4 km
Nippersink Creek (north branch)
61.6 mi
99.1 km
Nippersink Creek (north branch)
59.9 mi
96.4 km
53.8 mi
86.6 km
52.8 mi
85 km
Johnsburg
proposed
Boone Creek
63.1 mi
101.5 km
Harvard
Kishwaukee River (north branch)
55.7 mi
89.6 km
Woodstock Yard
planned
51.6 mi
83 km
Woodstock
50.6 mi
81.4 km
McHenry
47.3 mi
76.1 km
Prairie Grove
proposed
45.7 mi
73.5 km
Crystal Lake Yard
43.2 mi
69.5 km
Crystal Lake
41.7 mi
67.1 km
Pingree Road
38.6 mi
62.1 km
Cary
37.3 mi
60 km
Fox River Grove
31.9 mi
51.3 km
Barrington
26.4 mi
42.5 km
Palatine
24.4 mi
39.3 km
Arlington Park
22.8 mi
36.7 km
Arlington Heights
20.0 mi
32.2 km
Mount Prospect
18.6 mi
29.9 km
Cumberland
NCS to Antioch
NCS to Union Station
17.1 mi
27.5 km
Des Plaines Pace Pulse
15.0 mi
24.1 km
Dee Road
13.5 mi
21.7 km
Park Ridge
12.6 mi
20.3 km
Edison Park
11.4 mi
18.3 km
Norwood Park
10.1 mi
16.3 km
Gladstone Park
9.1 mi
14.6 km
Jefferson Park Pace Pulse
MD-N to Fox Lake
12.3 mi
19.8 km
Skokie
10.8 mi
17.4 km
Lincolnwood
MD-N to Union Station
9.8 mi
15.8 km
Sauganash
Weber Subdivision
to UP-N
Peterson Avenue
River Jct.
Chicago River (north branch)
7.6 mi
12.2 km
Mayfair
7.1 mi
11.4 km
Kostner Avenue
7.0 mi
11.3 km
Irving Park |
5.9 mi
9.5 km
Parkview
5.1 mi
8.2 km
Avondale
4.1 mi
6.6 km
Maplewood
UP-N to Kenosha
2.9 mi
4.7 km
Clybourn
UP-W to Elburn
1.7 mi
2.7 km
Kinzie Street Depot
Chicago River (north branch)
0.0
MD-N MD-W NCS Amtrak
0.0
Ogilvie
Mileage source[3]

Handicapped/disabled access All stations are accessible except
Clybourn and Gladstone Park.

The Union Pacific Northwest Line (UP-NW) is a commuter rail line provided by Metra and operated by the Union Pacific Railroad in Chicago, Illinois and its surrounding suburbs. While Metra does not refer to any of its lines by colors, the timetable accents for the Union Pacific Northwest Line are bright "Viking Yellow," honoring the Chicago & North Western Railway's Viking passenger train.[4]

The line runs from Ogilvie Transportation Center to Harvard, Illinois. However, most trains terminate in Crystal Lake, Illinois. A branch line to McHenry, Illinois operates during weekday rush hours in the peak direction. Overall, this is Metra's longest route and one of three routes with branches (the others being the Rock Island District and Metra Electric District). The line is Metra's second busiest with an average of 38,600 boardings on a weekday. It is second only to the BNSF Line.

As of February 16, 2024, Metra operates 78 trains (39 in each direction) on the line on weekdays. Of these, 14 inbound trains originate from Harvard, three from McHenry, 13 from Crystal Lake, four from Barrington, one from Palatine, and four from Des Plaines. Five outbound trains terminate at Des Plaines, three at Palatine, three at Barrington, 12 at Crystal Lake, three at McHenry, and 13 at Harvard.

Metra operates 34 trains (17 in each direction) on the line on Saturdays. Of these, 10 inbound trains originate from Harvard, five from Crystal Lake, one from Barrington, and one from Arlington Heights. Two outbound trains terminate at Barrington, five at Crystal Lake, and 10 at Harvard.

Metra operates 21 trains (10 inbound, 11 outbound) on the line on Sundays. Of these, seven inbound trains originate from Harvard, two from Crystal Lake, and one from Arlington Heights. Three outbound trains terminate at Crystal Lake and eight terminate at Harvard.

There is no service at Gladstone Park station or on the McHenry branch on weekends or holidays. All other stations are open daily.

The main line is triple-tracked from Clybourn to just southeast of Barrington, with a bidirectional express track, and double tracked from Barrington to Harvard. The McHenry branch is single-tracked. Historically, double track was maintained from Harvard to Baraboo, Wisconsin. A now-gone portion of the Union Pacific Northwest Line diverged at Harvard and passed through Beloit, Wisconsin, and reconnected to the main line at Evansville junction to allow a separate passenger and freight line. Around the time the Beloit line was abandoned, the railroad single-tracked the line from Harvard to Janesville.

Metra has included the possibility of extending the McHenry branch to Johnsburg in their Cost Benefit Analysis report. If this were to happen, the branch would open an infill station in Prairie Grove. Additionally, an infill station would open in Ridgefield between Crystal Lake and Woodstock along the line to Harvard.[5]

By the first quarter of 2024, the Union Pacific Railroad is expected to transfer operations of the three Union Pacific lines to Metra. The Union Pacific will continue to own and maintain the right-of-way.[6]

  1. ^ "Archived copy" (PDF). Archived from the original (PDF) on May 21, 2015. Retrieved April 29, 2015.{{cite web}}: CS1 maint: archived copy as title (link)
  2. ^ "Archived copy" (PDF). Archived from the original (PDF) on May 21, 2015. Retrieved April 29, 2015.{{cite web}}: CS1 maint: archived copy as title (link)
  3. ^ State of the System - Union Pacific Northwest
  4. ^ "Did you know?" (PDF). On the Bi-Level: 3. June 2009. Archived from the original (PDF) on 2010-01-02.
  5. ^ "Systemwide Cost Benefit Analysis of Major Capital Improvements" (PDF). Retrieved May 7, 2022.
  6. ^ "Union Pacific Transferring Commuter Rail Services to Metra". Union Pacific Railroad. Retrieved April 1, 2023.

© MMXXIII Rich X Search. We shall prevail. All rights reserved. Rich X Search