Mass Rapid Transit Master Plan in Bangkok Metropolitan Region

Bangkok Mass Rapid Transit System
Map as of Jan 2024
Map as of Jan 2024
Overview
OwnerBMA
MRTA
SRT
LocaleBangkok Metropolitan Region
Transit typeCommuter rail
 SRT 
 SRT 
Airport rail link
 ARL 
Rapid transit
 BTS 
 BTS 
 MRT 
 MRT 
 MRT  (under construction)
Light rail
Silver Line (planned)
Monorail
 MRT 
 MRT  (planned)
 MRT 
 MRL  (planned)
 MRL  (planned)
People Mover
 MRL 
Number of linesCurrent: 10 lines (Total planned: 15 lines)
Number of stations190 out of planned 310
Daily ridership1.68 million[1]
Operation
Began operation5 December 1999
Operator(s)S.R.T. Electrified Train
 SRT 
 SRT 
Asia Era One
 ARL 
Bangkok Mass Transit System
 BTS 
 BTS 
 MRT 
 MRT 
 MRL 
Bangkok Expressway and Metro
 MRT 
 MRT 
 MRT  (likely)
Technical
System length261.47 km (162 mi)
Track gaugeMRT, BTS and Airport Rail Link: 1,435 mm (4 ft 8+12 in) standard gauge
SRT Red Lines: 1,000 mm (3 ft 3+38 in) metre gauge
ElectrificationMRT and BTS: 750 V DC third rail
ARL and SRT: 25 kV 50 Hz AC overhead catenary
Top speedMRT and BTS: 80 km/h (50 mph)
ARL and SRT: 160 km/h (99 mph)

The Mass Rapid Transit Master Plan in Bangkok Metropolitan Region, or M-Map, is the latest version in a series of Thai government plans for the development of an urban rail transit network serving the Greater Bangkok area. It was drafted under the care of the Office of Transport and Traffic Policy and Planning (OTP) of the Ministry of Transport.

  1. ^ "นิวไฮ! 25 ส.ค. ฝนตก-ศุกร์สิ้นเดือน ผู้โดยสารระบบรางพุ่ง 1.75 ล้านคน".

© MMXXIII Rich X Search. We shall prevail. All rights reserved. Rich X Search