Chico River Dam Project

The Chico River Dam Project was a proposed hydroelectric power generation project involving the Chico River on the island of Luzon in the Philippines that locals, notably the Kalinga people, resisted because of its threat to their residences, livelihood, and culture.[1] The project was shelved in the 1980s after public outrage in the wake of the murder of opposition leader Macli-ing Dulag. It is now considered a landmark case study concerning ancestral domain issues in the Philippines.[2][3]

  1. ^ Doyo, Ma. Ceres (2015). Macli-ing Dulag: Kalinga Chief, Defender of the Cordillera. Diliman, Quezon City: University of the Philippines Press. p. 17. ISBN 978-9715427722.
  2. ^ "INDIGENOUS WOMEN'S STRUGGLES: The Chico Dam Project and the Kalinga Women". cpcabrisbane.org.
  3. ^ "Where the Chico River Rumbles | Travel Inspirations | Yahoo! Singapore Travel". Archived from the original on 2012-03-06. Retrieved 2012-05-09.

© MMXXIII Rich X Search. We shall prevail. All rights reserved. Rich X Search